It seems like I was frantically busy all weekend, but without much concrete to show for it.
Friday night the Hayter starter cord snapped, fixed that and started it OK, Saturday, it just would not start, but backfired out of the carb! Wasted several hours over the two days, so its workshop for you now my boy.
Started Saturday with lots of hoeing and weeding, all the fruit areas, the onions, sweetcorn etc, only really missed the spuds and the squash. Then various non-gardening errands while it was really hot, picked six pounds of strawberries in the evening and put up my nice shiny plot numbers, firmly attached to the raised bed and a large lump of wood respectively.
Sunday, up and to the allotment society shop, bought four growbags, for my remaining tomatoes, now I've got to level and pave the greenhouse floor. The plants in the beds are doing well, even the first weed seedlings have just started to emerge! Put up a retaining fence cum wall at the edge of the Dalek Sanctuary, angle iron five foot long hammered into the ground two feet, and two gravel boards high behind it. Ran out of gravel boards, (reused), so need to get some more to finish, backfilled behind what I had done, clearing enough room for another dalek. Not sure what to run along the angle irons, some old polypropelene rope perhaps? Strimmed the main allotment path edges and the edges round both my plots. Mowed the lawn at home and at the allotment the entrance sides. Weedkilled Dianes plot for her and also the determined couch that has come back where I want to plant cabbages and leeks.
Today, just watered the Squash a little, weaning stage now and picked another six pounds of strawberries.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment